Drive Automotive Phase 10 Expansion: Piedmont, SC

Drive Automotive Ph 10
Hogan’s scope of work included over 9,000 cubic yards of cast-in-place concrete.  There were approximately 150,000 square feet of interior slab on grade with a light reflective dry shake hardener application and FF/FL flatness specification.  Hogan exceeded the flatness requirements of the warehouse floors by 20%.
The project also required over 100 feet of existing foundation to be removed and retrofitted with a new dock wall and dock pits while the current structure was temporarily shored and occupied. Hogan was able to shore up these columns in a manner that allowed them to demo the existing foundations and replace with new dock wall and dock pits in a safe and cost efficient manner.